Dental Office Amalgam Separator Requirements in Ohio: The June 14, 2027 Deadline
By the ACC Solutions Team
If your dental office in Cleveland or anywhere in Ohio places or removes amalgam fillings and drains to a public sewer, federal rule 40 CFR Part 441 requires an amalgam separator, two best management practices and a one-time compliance report. The date to circle now: an amalgam separator installed before June 14, 2017 only counts as compliant until it's replaced or until June 14, 2027, whichever comes first. That's about seven months from when we wrote this. ACC Solutions coordinates commercial plumbing in Cleveland and Cuyahoga County, and a separator swap in a working operatory is plumbing work we plan around patient hours.
Who wrote this: the ACC Solutions Team (Licensed General Contractor, License #CR25025171). It summarizes 40 CFR 441.10 to 441.50 on eCFR, EPA's Dental Effluent Guidelines page and the Northeast Ohio Regional Sewer District's Mercury Program page, read November 21, 2026. It's general information, not legal or environmental compliance advice. Your sewer authority has the final word.
Does the amalgam separator rule apply to my Ohio dental office?
Section 441.10 says the rule applies to "dental dischargers," with these exceptions:
- Specialties: offices that practice only oral pathology, oral and maxillofacial radiology, oral and maxillofacial surgery, orthodontics, periodontics or prosthodontics.
- Mobile units: wastewater from a mobile unit.
- No sewer discharge: offices that collect all amalgam process wastewater for a centralized waste treatment facility instead of sending it down the drain.
- No amalgam work: offices that don't place amalgam and remove it only in limited emergency or unplanned situations. These still have to certify that to the sewer authority in a one-time compliance report; after that, they're exempt from the rest of the rule.
So an orthodontist is out, but a general practice that drills out old fillings is in, even if it no longer places amalgam.
What the separator itself has to meet
Under section 441.30(a), each separator must:
- Comply with ANSI/ADA Specification 108 (2009, with the 2011 addendum) or ISO 11143 (2008 or a later version that still requires at least 95% removal efficiency), as assessed by an accredited testing laboratory.
- Be sized for the maximum discharge rate of amalgam process wastewater.
- Be inspected as the manufacturer's manual directs, including confirming that all amalgam process wastewater actually flows through the amalgam-retaining part.
- Have its amalgam-retaining unit replaced on the manufacturer's schedule or when it reaches the manufacturer's maximum fill level, whichever comes first.
- Be repaired or replaced as soon as possible, and no later than 10 business days after a malfunction is discovered.
The "all wastewater flows through it" line is the plumbing question. When chairs are added or vacuum lines are rerouted during a remodel, a branch can end up bypassing the separator. On a dental job we trace where every chair's vacuum and drain lines go before we price the work.
The June 14, 2027 deadline for older separators
Section 441.30(a)(1)(iii) gives a grace period: a separator installed at a dental facility before June 14, 2017 satisfies the standard and sizing requirements "until the existing separator is replaced" or until June 14, 2027, "whichever is sooner." After that date, a pre-2017 unit has to be replaced with one that meets the current standard and sizing rules.
| Your situation | What the rule says | What to do before mid-2027 |
|---|---|---|
| Separator installed before June 14, 2017 | Counts as compliant until replaced or June 14, 2027 | Find the make, model and install year (they're on your compliance report) and plan the replacement |
| Separator installed on or after June 14, 2017 | Must meet the standard and be sized correctly now | Keep inspection and cartridge records current |
| New office or new owner | One-time compliance report within 90 days | File with the sewer authority before the 90 days run out |
A practical tip: don't wait for spring 2027. A separator swap usually means shutting down suction to the chairs it serves, so schedule it for a day the office is closed. We plan dental work around your patient calendar.
The two best management practices
Section 441.30(b) adds two practices every covered office must follow:
- No waste amalgam down the drain. That includes amalgam from chair-side traps, screens, vacuum pump filters, dental tools, cuspidors and collection devices.
- No bleach-type line cleaners. Dental unit water lines, chair-side traps and vacuum lines that discharge amalgam process wastewater can't be cleaned with oxidizing or acidic cleaners, including bleach, chlorine, iodine and peroxide, that have a pH lower than 6 or greater than 8.
The second one matters to the plumbing: harsh cleaners can free mercury already trapped in the lines. Check the pH on whatever line cleaner your office buys.
Reports and records: the One-Time Compliance Report
Under section 441.50, existing offices had to file a One-Time Compliance Report with their "Control Authority" by October 12, 2020. New offices must file within 90 days after first discharging to the sewer, and a new owner must file a new report within 90 days after a transfer of ownership. The report lists the facility, owners and operators, the total number of chairs and the number where amalgam may be present, and each separator's make, model and year of installation. It also certifies the separator and best management practices, and names the service company if one maintains the separator.
Offices must keep these records for at least three years: each separator inspection (date, who did it, results and follow-up), each amalgam-retaining container replacement, and every pickup or shipment of collected amalgam with the name of the facility receiving it. EPA posts a sample compliance report, but it notes your Control Authority may use a different form.
Who is the "Control Authority" in Cleveland?
For most of Cleveland and many Cuyahoga County suburbs, the wastewater goes to the Northeast Ohio Regional Sewer District. NEORSD's Mercury Program page says Ohio EPA has given the District authority to regulate non-domestic sources that may discharge mercury, that it requires dental facilities and others to follow best management practices, and that its Water Quality and Industrial Surveillance staff inspect dental facilities. Questions go to mercuryprogram@neorsd.org or 216-641-6000. If your office is outside the District's area, ask your city or county sewer provider who receives the report.
Common mistakes we look for
- A buyer who doesn't refile. Buying a practice starts a new 90-day clock for the compliance report.
- Chairs added, separator not resized. The separator must handle the maximum discharge rate, so more chairs can mean a bigger unit.
- A bypass branch. A new operatory tied into the vacuum line downstream of the separator defeats it.
- Missing paper trail. Inspections and cartridge changes need dated records for three years.
- Waiting on the 2027 swap. A malfunction on an old unit still has a 10-business-day repair or replace limit.
Permits for a dental remodel
A separator replacement in an existing office is often part of a bigger change: new chairs, a new cuspidor, a relocated vacuum pump. Cities price that plumbing their own way. In Middleburg Heights, for example, section 1303.08 lists dental chairs and dental cuspidors among the fixtures charged $7 each on top of a $30 base fee when installed or changed in an existing building. See our Middleburg Heights commercial plumbing page for how that city's registration and inspections work, and our child care center plumbing guide for another regulated-occupancy example.
How ACC Solutions handles dental office plumbing
We start with a walkthrough of the operatories and the mechanical room, trace the vacuum and drain lines to the separator, and check the existing unit's install year against the 2027 date. Then we quote the work and plan it around your patient schedule. We don't sell or certify separators, and we don't file your compliance report; the practice files it with the sewer authority. What we do is make sure the plumbing gets all amalgam process wastewater to the separator and that the work is permitted and inspected.
LICENSED PLUMBING through ACC Solutions. For a walkthrough quote, call the plumbing desk at (216) 480-8899 or request a commercial plumbing project review. Preparing for the visit? Read what to have ready for a commercial plumbing walkthrough.
ACC Solutions Team
Licensed General Contractor, License #CR25025171
Plumbing desk: (216) 480-8899 · Phone: (216) 238-5999 · Email: support@accmgmtsolutions.com · Contact form
6545 Market Ave N, Canton, OH 44721
We work asynchronously, so you can reach us by email or the contact form from any time zone; you don't need to catch us during Ohio business hours.
Frequently Asked Questions
Do Ohio dental offices need an amalgam separator?
Yes, if the office places or removes amalgam and discharges to a public sewer. 40 CFR Part 441 requires a compliant separator, two best management practices and a one-time compliance report. Some specialties, mobile units and offices that don't discharge amalgam wastewater are excluded.
When does an old amalgam separator have to be replaced?
Under 40 CFR 441.30(a)(1)(iii), a separator installed before June 14, 2017 counts as compliant until it is replaced or until June 14, 2027, whichever comes first.
How fast must a broken amalgam separator be fixed?
The rule says as soon as possible, and no later than 10 business days after the malfunction is discovered.
Who gets the dental compliance report in Cleveland?
For offices served by the Northeast Ohio Regional Sewer District, NEORSD's Mercury Program regulates dental facilities. Contact mercuryprogram@neorsd.org or 216-641-6000. Outside the District, ask your sewer provider.
Can ACC Solutions replace a dental office amalgam separator?
We coordinate commercial plumbing in Cleveland and Cuyahoga County and quote every job after a walkthrough. Call the plumbing desk at (216) 480-8899. The practice files its own compliance report.