Short answer: in Ohio, an oil separator is required at repair garages where floor or trench drains are provided, at car washing facilities, and at factories where oily and flammable liquid wastes are produced. Oily, greasy or flammable waste has to pass through the separator before it reaches the building drain. Where cars are serviced, washed or fueled, the separator has to hold at least 6 cubic feet for the first 100 square feet of floor that drains to it, plus 1 cubic foot for each additional 100 square feet.

This post is from the ACC Solutions Team, which coordinates licensed commercial plumbing in Cleveland and Cuyahoga County. It summarizes the Ohio Plumbing Code, which is the 2021 International Plumbing Code as modified by Ohio Administrative Code rules. For Chapter 10 the Ohio changes are in OAC 4101:3-10-01 (effective March 1, 2024), and the base text is ICC's IPC 2021 Chapter 10; both were read November 23, 2026. It's general information, not a code opinion for your building. Your plans examiner and sewer authority decide your project.

Which businesses need an oil separator in Ohio?

The base IPC 2021 section 1003.4 lists four places: repair garages with floor or trench drains, car washing facilities, factories that produce oily and flammable liquid wastes, and hydraulic elevator pits. Ohio's rule changes that list. OAC 4101:3-10-01(H) deletes "and hydraulic elevator pits" and deletes the elevator-pit alarm exception, so Ohio's section 1003.4 covers the first three.

In everyday terms, the uses that bring this section into a lease or a remodel are:

  • Auto repair, quick lube, tire and service shops whose bays have floor or trench drains
  • Car washes and detailing operations that wash vehicles indoors
  • Fleet garages where vehicles are serviced, greased or repaired
  • Manufacturing spaces where oily and flammable liquid wastes are produced

Two exceptions come straight from section 1003.4.2.2: a parking garage where no servicing, repairing or washing happens and no gasoline is dispensed doesn't need a separator, and areas of a commercial garage used only to store vehicles don't have to drain through one.

How big does an oil separator have to be?

An oil separator has to be either listed and labeled, or designed to sections 1003.4.2.1 and 1003.4.2.2. The design route sets three numbers:

  • Depth: at least 2 feet below the invert of the discharge drain.
  • Outlet seal: the outlet opening needs at least an 18-inch water seal.
  • Capacity at garages and service stations: at least 6 cubic feet for the first 100 square feet of area drained, plus 1 cubic foot for each additional 100 square feet drained into it.

The capacity is based on the floor area that drains to the separator, not the size of the building. Some examples of the formula, for illustration only:

Floor area draining to the separatorMinimum capacity
100 sq ft (one small wash pad)6 cubic feet
600 sq ft (two service bays)11 cubic feet
1,400 sq ft (four bays and an aisle)19 cubic feet
3,000 sq ft (an indoor wash line)35 cubic feet

If your drained area isn't a round hundred, ask the plans examiner how they count the remainder before you order equipment. A listed and labeled unit is sized by its own listing, so read its rating against the drained area.

Ohio also lets the sewer authority add rules

Ohio rewrote two scoping lines in Chapter 10 that matter for shops. Section 1001.1 says the rules of the Ohio Environmental Protection Agency may also govern the design and installation of pretreatment devices such as traps, interceptors and separators. And section 1003.1 now begins "Where required by the local sewer purveyor or as otherwise required in this section." So the plumbing code is the floor, and the sewer authority that serves your address can ask for more. Call them before you size the unit, especially for a car wash, where water volume and grit matter as much as oil.

Washing bays also tend to need a sand or grit interceptor. Section 1003.5 says sand and similar interceptors for heavy solids must be easy to reach for cleaning and have a water seal of at least 6 inches.

Venting, access and cleaning

Section 1003.9 says interceptors and separators must be designed so they don't become air bound and must be vented by one of the Chapter 9 methods. Section 1003.10 says each one needs access for service, and must be maintained by periodically removing accumulated oil, scum and solids. In practice that means the lid can't end up under a lift, a parts rack or a new slab, and someone has to own the pump-out schedule in the lease.

Where these jobs go wrong

  • Change of use without a separator. A retail or warehouse space becomes a detailing or service shop, and the old floor drains still run straight to the building drain.
  • Sizing to the building, not the drained area. Or the reverse: a new bay is added to an old separator that was sized for fewer bays.
  • Buried access. A separator nobody can open doesn't get cleaned.
  • Mixing in other waste. Restrooms and break-room sinks don't belong on the separator line. Food-service waste has its own rules; see our guide to grease interceptor requirements.
  • Dry trap seals. Bay drains that rarely see water can lose their seal; our post on floor drain trap primers in Ohio covers when protection is required.

What ACC checks on a shop walkthrough

When an owner or tenant asks us about a service bay or wash bay, we start with the drains: where each floor and trench drain goes, whether there is an existing separator, whether it is listed and labeled or site-built, and whether its lid can actually be opened. Then we measure the floor area that drains to it, compare it with the formula above and ask the sewer authority what it requires at that address. Plumbing is quoted after the walkthrough; we don't quote from photos. We don't decide what the sewer authority requires, and we don't give environmental compliance advice.

If the space is also getting new restrooms or a water heater, see our North Olmsted commercial plumbing page for how city registration and permit fees typically work in Cuyahoga suburbs. Owners managing a building from out of state can use our rehab project coordination service.

Next step: call the plumbing desk at (216) 480-8899 or request a commercial plumbing project review.

ACC Solutions Team
Phone: (216) 238-5999 · Email: support@accmgmtsolutions.com · Contact form
6545 Market Ave N, Canton, OH 44721
We work asynchronously, so you can reach us by email or the contact form from any time zone; you don't need to catch us during Ohio business hours.

Frequently Asked Questions

Does an auto repair shop in Ohio need an oil separator?

Yes, if the repair garage has floor or trench drains. Ohio's version of plumbing code section 1003.4 requires oil separators at repair garages with floor or trench drains, car washing facilities, and factories that produce oily and flammable liquid wastes.

How do you size an oil separator under the Ohio Plumbing Code?

Where vehicles are serviced, washed or fueled, section 1003.4.2.2 requires at least 6 cubic feet for the first 100 square feet of area drained, plus 1 cubic foot for each additional 100 square feet. A listed and labeled unit can be used instead.

Do hydraulic elevator pits need an oil separator in Ohio?

Ohio's rule OAC 4101:3-10-01(H) deletes hydraulic elevator pits and the elevator-pit exception from section 1003.4, so Ohio's oil separator section lists repair garages, car washes and oily-waste factories.

Does a parking garage need an oil separator?

Not if no servicing, repairing or washing happens there and no gasoline is dispensed. Areas of commercial garages used only for vehicle storage also don't have to drain through a separator.

Can the sewer authority require more than the plumbing code?

Yes. Ohio's section 1003.1 starts with where required by the local sewer purveyor, and section 1001.1 says Ohio EPA rules may also govern pretreatment devices. Check with the authority that serves your address.